Post-project record

San Juan Capistrano Repipe Warranty & Closeout Checklist

Use these seven checks before final sign-off so inspection proof, warranties, testing, restoration, photos, and follow-up contacts stay together.

Seven records to collect at project closeout

1. Final inspection record

Keep the signed permit card, final approval, correction notices, and the name of the approving authority.

2. Approved scope and changes

Save the final written scope, selections, exclusions, change orders, and a room-by-room completion record.

3. Pipe and fitting warranty

Record the pipe manufacturer, product line, fitting system, warranty term, registration steps, and claim contact.

4. Contractor labor warranty

Document covered labor, exclusions, start date, response process, transfer terms, and emergency contact details.

5. Pressure and function checks

Retain test results and confirm fixture flow, hot-water delivery, shutoff operation, drainage, and visible leak checks.

6. Wall and finish sign-off

Photograph access locations and record drywall, texture, paint, tile, cabinet, exterior, and cleanup acceptance.

7. Owner or resident handoff

Share shutoff locations, care guidance, warranty contacts, final photos, and records with owners, residents, or the property manager.

Local handoff details

For San Juan Capistrano properties near Marbella, The Farm, San Juan Hills, Capistrano Royale, Rancho Viejo, note Santa Margarita Water District shutoff considerations, the address-specific inspection authority, shared-wall access, restoration locations, and who retains the master record. Confirm warranty and permit requirements with the contractor, manufacturer, association, and approving authority.