1. Final inspection record
Keep the signed permit card, final approval, correction notices, and the name of the approving authority.
Use these seven checks before final sign-off so inspection proof, warranties, testing, restoration, photos, and follow-up contacts stay together.
Keep the signed permit card, final approval, correction notices, and the name of the approving authority.
Save the final written scope, selections, exclusions, change orders, and a room-by-room completion record.
Record the pipe manufacturer, product line, fitting system, warranty term, registration steps, and claim contact.
Document covered labor, exclusions, start date, response process, transfer terms, and emergency contact details.
Retain test results and confirm fixture flow, hot-water delivery, shutoff operation, drainage, and visible leak checks.
Photograph access locations and record drywall, texture, paint, tile, cabinet, exterior, and cleanup acceptance.
Share shutoff locations, care guidance, warranty contacts, final photos, and records with owners, residents, or the property manager.
For San Juan Capistrano properties near Marbella, The Farm, San Juan Hills, Capistrano Royale, Rancho Viejo, note Santa Margarita Water District shutoff considerations, the address-specific inspection authority, shared-wall access, restoration locations, and who retains the master record. Confirm warranty and permit requirements with the contractor, manufacturer, association, and approving authority.